Interior Design Contract Checklist: 12 Clauses to Get in Writing Before You Pay

In This Article

By the Design Team at Elegante Interiors, Bengaluru | Published 12 November 2026

In October 2026, a district consumer commission in Hyderabad ordered an interior company to pay a homeowner ₹3.5 lakh for rectification, plus compensation and costs. The finished kitchen and cabinets did not match the 3D designs she had approved. The company’s defence was that it had built to its production drawings, and that the renders were only illustrative.

The commission did not accept that, because the company could not show it had told her so before she paid. That is the whole case in one line: what was written down, and when.

Most homeowners in Bangalore spend weeks comparing designs and prices, then sign whatever agreement the firm sends over in ten minutes. This guide covers the 12 clauses that decide what happens when something goes wrong, and how to read each one before you pay a rupee.

Quick answer

A good interior design contract names the exact drawings that will be built, lists every board, hardware and finish by brand and grade, ties each payment to a finished stage of work, sets a start date and a completion date with delay terms, explains how changes are priced, and spells out the warranty, the handover snag check and the cancellation terms. If a promise is only in a WhatsApp chat, a brochure or a 3D render, assume it is not in the contract.

Still choosing between firms? Our guide to reading an interior design quotation covers the pricing side. This post starts where that one ends: once you have picked a firm and are about to sign.

The 12 clauses every interior design contract needs

Read these in order. The first four decide what you are buying. The next four decide how it gets built and paid for. The last four decide what happens when something goes wrong.

What you are buying

1

Parties, site and a one-page scope summary

The full legal name of the firm (not just the brand), its GST number, your name, the flat address, and a short list of every room and unit included. A scope summary sounds obvious. It is also the clause that settles most “we never said we would do the balcony” arguments.

Ask for this in writing: the registered company name and a room-by-room list of what is in scope, and what is not.

Interior designer planning a modular wardrobe layout in 3D design software on a laptop
A 3D render shows how a room will look. The production drawings decide how it is built. Your contract should say which one governs.
2

Which drawings will be built

This is the clause from the Hyderabad case. Firms usually work with two sets of documents: 3D renders, which show the look, and production drawings, which give dimensions, materials and hardware for the factory or carpenter. They are not always identical. Renders often show finishes, lighting and accessories that production drawings simplify.

That is normal. What is not acceptable is finding out after you have paid. The contract should list the final drawings by name or revision number, say which document wins if they differ, and include your signature on the final set.

Ask for this in writing: “Work will be executed as per production drawings revision __, signed by the client on __.” If renders are only indicative, the contract should say so, before you pay.

3

A material specification schedule

Every unit should have its board named: brand, grade and thickness for carcasses, shutters and the sink base separately. “Premium waterproof board” is not a specification. If you are unsure which board belongs where, our guide to HDHMR vs plywood explains the trade-offs zone by zone.

Ask for this in writing: a table listing each unit with its board brand, grade and thickness.

Laminate sample books and colour swatches used to choose wardrobe and kitchen finishes
Finish codes from the sample book belong in the contract, so the shutter that arrives matches the one you chose.
4

A hardware and finish schedule

Hinges, drawer channels, baskets, handles and lift-up mechanisms by brand and model. Laminate, acrylic or veneer finishes by the manufacturer’s code from the sample book. Countertop material and edge profile. Hardware is where substitutions are easiest to hide and hardest to spot until a hinge sags.

Ask for this in writing: brand and model for each hardware item, and the finish code for every shutter colour.

How it gets built and paid for

5

An itemised price with exclusions and taxes

The contract value should match the final quotation line by line, with GST shown separately and the rate stated. Just as important is the exclusions list: civil changes, electrical rewiring, painting, deep cleaning, appliances, society deposits and transport to upper floors are common extras. Anything not listed as included will usually be billed later.

Ask for this in writing: the itemised price, the GST line, and a written list of exclusions.

6

Payment milestones tied to finished work

The rule is simple: never pay ahead of the work. Each payment should be due when a stage is complete and visible, not on a date. Large firms publish their structures. Livspace’s published payment terms, for example, start with a booking amount of 10% of the quote (or ₹49,000, whichever is higher) and tie later payments to stages such as a carcass quality check or completion of on-site framework.

The structure below is what we suggest homeowners look for. It is a guide, not a legal standard, and the exact percentages will vary by firm.

Ask for this in writing: a payment schedule where every instalment names the stage of work that must be finished first.

10%

Booking

Design work starts

40–50%

Production

After you sign the final drawings

30–40%

Delivery & install

When units arrive on site and installation begins

5–10%

Handover

Only after the snag list is closed

Stacked plywood and laminate boards ready for production inside a modular furniture factory in Bangalore
Production is where the largest payment usually goes. It should only start once you have signed the final drawings.
7

A timeline with a clear start condition

“45 days” means nothing without a start point. Most delays start before work does: drawings not signed, the site not ready, or the builder still fixing defects. A good clause says the clock starts on a named event, such as final drawing sign-off plus site handover, and lists the milestones in between. Our 45-day 3BHK project timeline shows what a realistic sequence looks like, and our flat possession snag list covers getting the site ready.

Ask for this in writing: the start trigger, the completion date, and what happens if either side causes a delay.

8

How changes are handled

You will change something. Everyone does. The contract should say that every change is written down and priced, and that you approve the new price and the effect on the timeline before work on it starts. Verbal changes on site are the most common source of end-of-project disputes, on both sides.

Ask for this in writing: a written change-order process: description, price difference, timeline impact, your approval.

What happens when something goes wrong

9

Site responsibilities

Who gets society permission for work and material movement, who pays for lift usage or deposits, who removes debris, what hours the team works, and who provides power and water on site. In Bangalore apartment complexes, society rules on working hours and lift bookings can add days to a project if nobody owns them.

Ask for this in writing: a short list of who handles society permissions, debris removal and working hours.

10

Quality check and handover

The contract should promise a joint walkthrough before handover, a written snag list from that walkthrough, and a date by which each item will be fixed. The final payment should depend on that list being closed. Without this clause, “handover” can simply mean the day the team stops coming.

Ask for this in writing: a joint handover walkthrough, a written snag list, and final payment linked to its closure.

11

Warranty, in detail

“Lifetime warranty” or “10-year warranty” on a brochure is not a warranty clause. The contract should say what is covered (board, hardware, installation workmanship), for how long each part is covered, what voids it (water damage, misuse, third-party changes), and how you raise a claim and how fast someone visits. Hardware warranties usually come from the hardware brand, not the interior firm, so ask whose warranty each item carries.

Ask for this in writing: a warranty table: component, period, who honours it, exclusions, and the claim process.

12

Cancellation, refunds and disputes

What you get back if you cancel at each stage, what the firm owes you if it abandons the project, and where disputes will be heard. Look for Bengaluru jurisdiction rather than the firm’s head-office city, and a clear refund timeline. Even with a signed contract, homeowners in India can approach a consumer commission over deficient service, as the Hyderabad case shows, but a clear cancellation clause usually settles things long before that.

Ask for this in writing: refund amounts per stage, a refund timeline, and Bengaluru as the jurisdiction.

Green flags and red flags in the agreement

Green flags

  • Drawings listed by revision and signed by you
  • Board, hardware and finish named by brand and code
  • Payments tied to finished stages
  • Start date tied to a clear trigger
  • Written change orders
  • Warranty broken down by component
  • Final payment held until the snag list closes

Red flags

  • “As discussed” or “as per design” with no document named
  • “Premium board” or “branded hardware” with no brand
  • Large payments due on dates, not stages
  • 70% or more before production starts
  • No exclusions list
  • Warranty only on the website, not in the contract
  • No refund terms for cancellation

How to review the contract in one evening

You do not need a lawyer for a standard home interior contract, although it is worth paying for one on a large villa or commercial project. You do need to read it properly. Put the final quotation, the signed drawings and the contract side by side, and check that every item in the quotation appears in the contract with the same specification. Then go through the 12 clauses above and mark any that are missing or vague.

Send your questions by email, not on a call, and ask for the answers to be added to the contract or attached as an annexure. A firm that is confident in its work will usually agree. If a firm resists putting its own promises in writing, that tells you something too.

Interior design studio in Bengaluru where clients review finishes and meet their designer before signing
A studio visit is a good time to ask to see a sample contract before you commit.

At Elegante Interiors, you are welcome to ask for a sample agreement before booking, and to take it home and read it. Book a studio visit or use our interior price calculator to get a starting budget first.

Frequently asked questions

What should an interior design contract include?

It should include the firm’s legal name and GST number, the site address and scope, the final drawings that will be built, a material schedule naming every board by brand, grade and thickness, a hardware and finish schedule, an itemised price with exclusions and GST, payment milestones tied to finished work, a timeline with a clear start trigger, a change-order process, site responsibilities, a handover walkthrough, warranty details and cancellation terms.

How much advance should I pay an interior designer?

A booking amount of around 10% is common in Bangalore, and some large firms set a minimum amount instead. Larger payments should be tied to finished stages, such as signing the final drawings or the start of production, not to dates. Be cautious of any firm that asks for 70% or more before production starts, and keep the last 5 to 10% until the handover snag list is closed.

Are 3D renders part of the contract?

Only if the contract says so. Many firms treat renders as indicative and build from production drawings, which can differ in finishes, lighting and details. Ask the firm to state in the contract which drawings will be built, list them by revision, and say whether renders are binding. In a 2026 Hyderabad case, a consumer commission held a firm liable because it had not explained this before taking payment.

What warranty should an interior company give?

Look for a written warranty that separates the board, the hardware and the installation workmanship, gives a period for each, lists what voids it, and explains how to raise a claim and how quickly someone will visit. Hardware warranties often come from the hardware brand, so ask whose warranty applies to each item. A warranty mentioned only on a website or brochure is much harder to enforce.

Can I take an interior designer to consumer court?

Yes. Homeowners in India can file a complaint with a consumer commission over deficient service, such as work that does not match what was agreed or an abandoned project. A clear written contract, signed drawings, payment receipts and dated photographs make a complaint much stronger. For anything beyond a straightforward dispute, speak to a lawyer, as we are interior designers and this is not legal advice.

Do I need a lawyer to review an interior design contract?

For a standard apartment interior project, most homeowners can review the contract themselves using a checklist like this one, as long as they compare it carefully with the quotation and drawings. For a high-value villa, a commercial fit-out, or a contract with unusual cancellation or liability terms, a short review by a property or contracts lawyer is worth the fee.